17th Avenue Cul-de-Sac Project

The city is planning to potentially replace three cul-de-sacs with through streets to 17th Avenue, starting first with Alton Street to test the project's effectiveness.

The "dead end" cul-de-sacs will be removed on Alton, Beeler and Boston streets to allow vehicular traffic to flow through to 17th Avenue. The changes are due to concerns from local residents, property owners and the Aurora Police Department about loitering and crime.

The curb lines, sidewalks and sewer lines will be adjusted to accommodate the through-street configuration. New ADA curb ramps are anticipated at the intersections.

Planned Survey Work

A topographic survey will be performed to locate and record existing property line monumentation and to measure the existing elevations of the roadway, sewer grates, sidewalks and similar within the project area. Fence lines will also be surveyed and compared to property line records; homeowners will be contacted independently if a fence line is encroaching into the city of Aurora right of way.

Project Funding

The city of Aurora is providing funding for both design and construction of this project.

Anticipated Timeline

  • December 2024: Go to site for topographic survey work (weather dependent)
  • February 2025: Start design
  • May 2025: Complete design and submit plans for city review/approval
  • May 2025: Advertise project for construction bids
  • July 2025: Start construction on selected street

Questions?

Email [email protected]