google-site-verification: googlee16c7726ecc34510.html

Trail & Park Detours/Closures

Canterbury Park Renovation
This project will provide exciting new features for Canterbury park. The improvements will consist of a new inclusive playground for children ages 2- 5 and 5-12 years old, shade, new walks around the park with upgraded accessibility along with site furnishings. Irrigation system modifications will provide for a water conscious landscape and select turf conversion areas to native prairie grasses.

Construction will be underway Fall 2021 and continue through Spring 2022 (weather permitting).  The entire park site will remain closed for the duration of the renovation. For more information or answers to questions, please contact John Sawatzke at 303-739-7164 or jsawatzk@auroragov.org

Canterbury

Rome Way Closure
Rome Way will close south of Jewell before the southern entrance to the U-Haul lot. It will be closed from October 25 through October 28. For more information please call 303.744.2338.

Tollgate Creek Confluence 
Construction is complete. If you have questions, please email cpd_info@Auroragov.org or call 720.859.4312.

Sand Creek and Tollgate Creek Interceptor Diversion Structures Rehab
Construction is delayed.  Construction is expected to begin at the 6th & Sable site in mid-October.  Construction near Tollgate open space is expected to begin mid-November. If you have questions, please email cpd_info@Auroragov.org or call 720.859.4312.

Piney Creek Trail - Waterline Repair

Construction to repair a waterline on the south side of Arapahoe Road will impact the Piney Creek Trail access at the Saddle Rock maintenance shop. Construction will begin September 2021. Beginning October 19, crews will have large pipe and vehicles along the trail. Contractors will use the Piney Creek Trail access off Arapahoe Road near the Saddle Rock maintenance yard entrance, the Gartrell and Larkspur Park trails to access work areas in and on both sides of the creek. The trails will remain open, however please w
atch for construction equipment and follow caution signs. If you have questions, please email cpd_info@Auroragov.org or call 720.859.4312.
Piney Creek Detour
SC2 - 5 Sewer Upgrade at Smoky Hill and Quincy near Carson Park

Design phase of the project continues. Construction of the project is planned for Summer 2022. If you have questions, please email cpd_info@Auroragov.org or call 720.859.4312.

Grandview Dog Park New Access Road/Quincy Vault Project

Construction continues at the Grandview Dog Park as part of the AW Quincy vault project.
Dog park patrons will share the access road with the construction project parking. Please GO SLOW as you enter/exit. For safety - please read and follow signage, watch for flaggers, workers and construction equipment. Please be patient, at times there will be one-way traffic. Construction will continue thru Fall 2021. The dog park is open during this time. If you have any questions, please call 720.859.4312.

 

Sturgeon/Xcel Trail Closure E. Kentucky Avenue and E. Kepner Drive

Sturgeon/Xcel will close the trail NE of E. Kepner Drive between E. Kentucky Ave and S. Waco Way.  Construction will begin April 19-23, 2021.  P
lease read and follow signage, watch for workers and construction equipment. If you have any questions, please call 720.859.4312.

Sturgeon


Sand Creek and Sports Park Vault Enlargements

Enlargement of the vaults at Sand Creek and Sports Park. Construction activities associated with the vault installation will be confined to the southeast corner of Sports Park, including a small portion of the southeast parking lot and the trail, berm and fringe around the southeast field. Survey and design work will begin Fall 2021. Construction is expected to begin Spring 2022. Please watch for trail closures and detour signs. If you have questions, please email 
cpd_info@Auroragov.org or call 720.859.4312.

CIPP Rehab
Rehabilitation of the sanitary sewer segment from 33rd Place to 30th Ave along Sand Creek will begin in late 2021 through March 2022.   If you have questions, please email cpd_info@Auroragov.org or call 720.859.4312.

Whispering Pines Trail

Landscaping continues. If you have any questions, please call 303.739.7147.
 
Coal Creek Arena and nearby Sand Creek Open Space

Installation of power lines in the open space area north of the Stephen D. Hogan Parkway will continue. Please be aware of large equipment near and adjacent to the regional trail. If you have any questions, please call 303.739.7160.

Cherry Creek Spillway Restoration Project

The purpose of the project is to restore the spillway as close to its original configuration as practical. Construction began in early November. The contractor started in the area between Cherry Creek Reservoir and Parker Road, and is generally moving northeast from there. Earthwork should be completed late in 2021. Seeding, landscaping and stabilization will continue for most of 2022. There should not be any loaded equipment on Aurora streets. Haul routes will include some trails internal to the park. The contractor indicated that no closures are anticipated, but there will be crossings. Appropriate measures will be taken to ensure the safety of the public. Any questions from the public should be directed to David Lagrone, 402.995.2475, David.L.Lagrone@usace.army.mil

City of Aurora | All Rights Reserved | Powered by CivicLive | © 2021 Intrado Corporation.